Scaffolding Training Details
Space
Total Space Allocation:
1800 sq ft
Training Duration
Scaffolding:
8 Weeks
Practical Skill Testing Availability
No. of Bay:
3 Sets
Equipment:
Pipe, Clam, Water Level, Wood.
Tools:
Resort Range, G. I Wire.
Tools
Scaffolding Tools:
Richared Spanners, Wire cutters, Spirit Level, Measuring tapes, Markers and hammers.
Scaffolding Materials:
1.5, 2, 3, 4, and 6 meter pipes; 1.5, 2, 2.5, and 3 meter planks, Base plates, Fixed, Swivel, Bone joint, and G couplers.
Scaffolding PPE:
Safety Helmet, Safety Ear Plug, Safety Dust Mask, Safety Goggles, Safety Overall, Safety Hand Gloves, Safety Body Harnesse, Safety Shoe etc.
Training Methodology
- First screening on the candidates – physical tests will be taken.
- The selected candidates will be taught first on the usage of the PPE.
- Knowledge on how to use the measuring tape will be given.
- Material and tools names will be explained.
- Lacing of wires, fixing of planges on pipe and planges will be taught.
- Then practically will start on the various methods of scaffolding as below.
- Independent Scaffolding.
- Tower Scaffolding.
- Cantilevered Scaffolding.
- Mobile Scaffolding.
- Cargo Hold Scaffolding.
- Birdcage Scaffolding.